6 Teel Parkway construction Project: Teel Parkway will be improved with a four- lane concrete divided roadway. The improvements include paving, a retaining wall, drainage and median landscaping. The project spans First Street to Freeman Way. Update: The project is in the design phase. • Timeline: winter 2027-summer 2029 • Cost: $800,000 • Funding source: town of Prosper 7 Coit Road Phase 2 widening Project: Coit Road from Prosper Trail to Frontier Parkway will be widened from a four-land roadway to a six-lane roadway. This project is a part of a greater Coit Road widening project, which also includes Coit from First Street to Prosper Trail. Update: The project is in the design phase.
from Dallas North Tollway to Coleman Street. The project includes concrete curb and gutter roadway, underground drainage improvements and a water line. Update: The project is in the preconstruction phase. • Timeline: spring 2026-fall 2027 • Cost: $27.79 million
spans from First Street to Prosper Trail. Update: The project is under construction. • Timeline: summer 2025-summer 2026 • Cost: $23.64 million, includes phase 2 • Funding source: town of Prosper 9 Choate Parkway construction
Upcoming projects
MALONE ST.
E. CARTHAGE RD.
1 Glendenning Parkway reconstruction Project: Glendenning Parkway will be reconstructed and expanded into a four-lane divided roadway from Dallas Parkway to Preston Road. The project includes drainage, bridge and pavement markers. Update: The project has been delayed and does not have an estimated start date. The schematic design has been completed and the Texas Department of Transportation is actively acquiring right-of-way. TxDOT placed a hold on the design. • Timeline: TBD • Cost: TBD • Funding source: city of Celina, TxDOT 2 Legacy Drive extension Project: Legacy Drive will be expanded to connect Carthage Drive to Louisiana Drive. Update: The project is in the design phase. • Timeline: estimated completion December 2027 • Cost: $2.72 million
10
1
2
LEGACY DR.
N. LOUISIANA DR.
OKLAHOMA DR.
• Funding source: town of Prosper 4 First Street expansion
GLENDENNING PKWY.
Project: Choate Parkway is being reconstructed from Coit Road to Roseland Parkway. The project is shared with the city of Celina and the adjacent subdivision developer. Update: The project is under construction and will be done in two phases. Lighting and landscaping will not be included in this project. • Timeline: estimated completion October 2026 • Cost: $10.44 million • Funding source: city of Celina, external sources 10 Oklahoma Drive improvements Project: Oklahoma Drive is being updated from Pecan Street to Malone Drive. The project will replace the existing asphalt roadway with two concrete lanes. Update: The project is under construction and waiting on utility relocations. • Timeline: estimated completion September 2026 • Cost: $3.04 million • Funding source: city of Celina
ROSELAND PKWY.
CHOATE PKWY.
Project: First Street will be reconstructed and widened from a two-lane roadway to a three-lane roadway from Coleman Street to Craig Road.
E. OUTER LOOP
9
Celina
428
Update: The project is in the design phase. • Timeline: winter 2028-summer 2030 • Cost: $13 million • Funding source: town of Prosper 5 Gee Road improvements
6
1385
FRONTIER PKWY.
COLEMAN ST.
PARVIN RD.
7
E. PROSPER TRL.
• Timeline: winter 2026-spring 2028 • Cost: $23.64 million, includes phase 1 • Funding source: town of Prosper
Project: Gee Road will be improved from FM 1385 to US 380. The project includes additional lanes, paving improvements and a foot bridge over Doe Branch drainage crossing. Update: The project is in the design phase and does not have an estimated start time. • Timeline: TBD • Cost: $21.9 million • Funding source: town of Prosper
FREEMAN WAY
DNT TOLL
8
Prosper
CRAIG RD.
GEE RD.
6
FIRST ST.
Ongoing projects
• Funding source: city of Celina 3 First Street widening
COUNTY RD.
3
4
5
8 Coit Road Phase 1 widening Project: Coit Road will be widened from a four-lane roadway to a six-lane concrete roadway. The project
TEEL PKWY.
380
Project: First Street will be widened from a two-lane rural roadway to a four-lane divided suburban roadway
UNIVERSITY DR.