Bastrop - Cedar Creek Edition | March 2024

41

Transportation

BY JANE TURCHI

Aected roads:

• Annika Way • Barbara Way • Belinda Court • Bills Circle

MAPLE ST.

95

BOB BRYANT PARK

HAWTHORNE ST.

MAGNOLIA ST.

BUSH COVE

• Blair Avenue • Bryant Drive • Carole Cove • Caylor Cove • Charles Boulevard • Elizabeth Lane • Hasler Shores • Jennifer Lane • Jessica Place • Jordan Cove • Katy B Lane • Kelly Court • North Lori Circle • Marino Court • Nicole Way • Patton Lane • Rebecca Lane • Schaefer Boulevard

LOCUST ST.

GARFIELD ST.

LINCOLN ST.

HASLER SHORES

ELM ST.

ROOSEVELT ST.

MYRD.

BUTTONWOOD ST.

95

FISHERMAN'S PARK

21

HIGGINS ST.

150

WALNUT ST.

GRADY TUCK LANE

WALNUT ST.

AUSTINST.

21

EMILE ST.

304

71

21

Aected roads:

150

21

71

• Antelope Trail • Bear Hunter Drive • Big Horn Pass • Bird Dog Bend • Bowstring Bend • Buckshot Court • Bushmaster Bend • Caliber Cove • Carbine Court • Double Barrel Court • Grutsch Drive

• Home Depot Way • Hunters Crossing Boulevard • Hunters Point Drive • Javelina Trail • Magnum Trail • Maverick Drive • Mossberg Lane • North Hunting Lodge Drive • Outitter Drive • Pack Horse Drive • Pony Pass

• Peccary Pass • Pheasant Trail • Remington Run • South Hunting Lodge Lane

HUNTERS CROSSING BLVD.

COMMERCIAL DR.

HOME DEPOT WAY

PARK LANE

• Steel Shot Court • Thompson Trail • Trophy Court • Wild Cat Drive • Wolverine Pass

CORPORATE DR.

304

MAP NOT TO SCALE N

SOURCE: THE CITY OF BASTROPCOMMUNITY IMPACT

City of Bastrop to start $1.1 million road maintenance project

Spring Street • May 1-2: Hunters Crossing Boulevard, Home Depot Way, Outtter Drive, Industry Drive, Corporate Drive, Mauna Loa Lane • May 3-4: Hunters Crossing Boulevard Bowstring Bend, Wildcat Drive, Bear Hunter Drive, Hunters Point Drive, Antelope Trail, Grutsch Drive • May 6-7: Hasler Shores, Barbara Way, Elm Street, Gareld Street, Lincoln Street, Bush Cove • May 8-9: Home Depot Way, Magnum Trail, Thompson Trail, Mossberg Lane, Carbine Court, Outtter Drive • May 10-11: Pack Horse Drive, Pony Pass, Wildcat Drive, Javelina Trail, Wolverine Pass, Trophy Court, Bird Dog Bend, Browning Drive, Outtter Drive, Hunters Crossing Boulevard

mobility can call the Holbrook Asphalt Oce at 435-652-4427 to coordinate accommodations. What they’re saying The city will engage in further road work and planning over the next 18 months, City Manager Sylvia Carrillo said. The strategy is part of the city’s eorts to work smarter, not harder, Carrillo said. Further updates will be available on the Community Impact website: communityimpact.com. Looking forward Surfacing projects are a part of the city’s work to repair and rehabilitate the roads. The new trans- portation impact fee will fund new roads such as Blakely Lane and Agnes Street. Initial roadwork dates (April 29-May 11): • April 29-30: Cedar Street, Haysel Street,

Roads within Bastrop’s downtown, Tahitian Village and Hunters Crossing are among those scheduled to receive high density mineral bond pavement preservation treatment this spring. The treatment extends the life of asphalt streets, lasting two to three times longer than seal coats, ocials said. Following a November vote to redistribute a portion of sales tax funds to road work, the city is expected to receive an extra $3.3 million a year for road work. The project is part of the city’s new approach to roadway maintenance. What to expect Weather permitting, roadwork will take place 7 a.m.-7 p.m. from April 29-June 15. Cars parked on streets the day they are scheduled to be treated will be towed. Residents with limited

17

BASTROP EDITION

Powered by