Transportation
BY AMANDA CUTSHALL
Upcoming project
Upcoming project
Ongoing project
Old Iron Bridge
T .
Realignment
973
1
3
2
130 TOLL
812
183
150
21
N
N
N
1 FM 812 enhancements Project: This will widen 9.5 miles of FM 812 to four divided lanes, realign a 1.5-mile stretch between US 183 and FM 973, add a shared-use path and sidewalks, improve drainage and upgrade guardrail and barrier standards on ve bridges. Update: Right-of-way acquisition and utility work are underway • Timeline: TBD • Cost: $145 million • Funding source: Texas State Highway Fund
2 Wilson Street repaving Project: A task order with Bennett Paving includes plans for asphalt repair, milling, overlays, base repair and trac control, with an optional tie-in at Wilson and Buttonwood streets. Update: Bastrop City Council approved the task order at a special-called meeting April 30 • Timeline: TBD • Cost: $462,400 • Funding source: 2026 Street Rehabilitation Fund
3 Old Iron Bridge rehabilitation Project: Work includes adding stairs, a concrete deck, steel truss components, railing and decorative lights to the historic bridge. Update: Bastrop City Council OK’d $552,000 in change orders April 14 for a safer walking surface and a stairway to the riverwalk below • Timeline: August 2025-September 2026 • Cost: $9.6 million • Funding source: certiicates of obligation series 2018, 2023 and 2025
Kids are always growing. Always becoming. At Dell Children’s, you can count on world-class care that grows with them. Our nationally ranked pediatric specialists are here to unlock possibilities — helping every child grow, heal and thrive. Because every “someday” deserves expert care today.
Big dreams deserve exceptional care
The only nationally ranked pediatric hospital in Central Texas. DellChildrens.org
© Ascension 2026. All rights reserved.
20
COMMUNITYIMPACT.COM
Powered by FlippingBook