Pflugerville - Hutto Edition | January 2023

BELTRAN FENCES

• Trash Haul 14’ x 6’ $300 • Gate Replacement Cedar $180 Pine $150 • Post Replacement Steel Post $150 /EACH 4’ x 4’ Post $120 /EACH (Labor and materials included) • Stain $5 /FT (Materials included)

• Power Washing Fence $1.50 /EACH LINEAL FT (Labor and materials included) • Tree Trimming

FREE ESTIMATES ESTIMADOS GRATIS

SMALL REPAIRS OR JOBS WELCOME! FLOORING INSTALL & REPAIRS

FULLY INSURED

CALL ALFREDO! (512) 552-4409

5 1112 ---2 5 3 ---4 3 5 3

alfredogalvan4409@gmail.com www.beltranfences.com

INSTALLED WITH QUALITY MATERIALS AND BUILT TO LAST!

AFTER

BEFORE

GENERAL, COSMETIC AND IMPLANT DENTISTRY

Visit by 2/15/2023 $ 1,495 IMPLANT PLACEMENT

NEW PATIENT SPECIAL $ 59 Initial Exam and Regular Cleaning Visit by 2/15/2023

IN-HOUSE WHITENING SPECIAL

$ 3,499 INVISALIGN Starting at Visit by 2/15/2023

$ 299 Normally $599 Visit by 2/15/2023

WEEKDAYS UNTIL 8PM All PPO Accepted!

16560 RR 620, Ste 104, Round Rock, TX 78681 rrdentist.com

512-488-9588 CALL OR TEXT US TODAY!

35

PFLUGERVILLE - HUTTO EDITION • JANUARY 2023

Powered by