1 Hwy. 75 improvements Project: Hwy. 75 between South Loop 336 North and Gladstell Street is undergoing improvements such as planing and base repair. Update: According to a July 8 media update from the Texas Department of Transportation, this project is 20% complete. • Timeline: first quarter of 2025-fourth quarter of 2025 • Cost: $3.3 million • Funding source: state funds 2 Hwy. 105 widening Project: Hwy. 105 is being reconstructed and widened from two to four lanes between 10th Street and South Loop 336. Update: This project is 42% complete, according to TxDOT. • Timeline: March 2023-second quarter of 2028 • Cost: $52.65 million • Funding source: state funds 3 I-45 high-occupancy vehicle extension Project: Between FM 1488 and South Loop 336 South, I-45 is undergoing an extension of its high-occupancy vehicle lane. Update: This project is 40% complete, according to TxDOT. • Timeline: second quarter of 2025-fourth quarter of 2025 • Cost: $1.3 million Project: South Loop 336 is being widened from two to four lanes with a continuous left turn lane between I-45 and Ladera Creek Trace. Update: This project is 32% complete, according to TxDOT. • Timeline: November 2024-third quarter of 2027 • Cost: $20.57 million • Funding sources: state, federal funds 4 South Loop 336 widening
Willis
Montgomery
1097
LONE STAR PKWY.
LAKE CONROE
75
5
830
2432
1484
105
149
2854
336
Conroe
KEENAN CUT OFF RD.
LANDERA CREEK TRACE
1
2
GLADSTELL ST.
3083
10TH ST.
SGT ED HOLCOMB BLVD.
6
FISH CREEK THOROUGHFARE
45
3
1314
149
WEST FORK SAN JACINTO RIVER
1488
242
N
MAP NOT TO SCALE
poles along the main lanes. Update: This project is 8% complete, according to TxDOT. • Timeline: February 2025-first quarter of 2026 • Cost: $1.45 million • Funding source: state funds 6 South Loop 336 lighting Project: Safety lights, conduit, conductors and other
electrical services are underway along South Loop 336 between I-45 and Sgt. Ed Holcomb Blvd. Update: According to a July 8 media update from TxDOT, this project is 98% completed. • Timeline: December 2024-third quarter 2025 • Cost: $518,164 • Funding source: state funds
• Funding source: state funds 5 I-45 LED installation
Project: Between FM 830 and Shepard Hill Boulevard, I-45 is undergoing the installation of high-mast LED
cabinet remodels under $5,000 15% OFF 20% OFF cabinet remodels $5,000 or more FREE Design Consultation! Call for your
SMART CABINETS.
Kitchens, Bathrooms & Custom Designs Free In-Home Design Consultations Professional, Precise Installation Locally Owned. Nationally Recognized.
Discounts given after estimate
STUNNING RESULTS.
346-536-4664 | www.cabinetiq.com/woodlands
29
CONROE - MONTGOMERY EDITION
Powered by FlippingBook