San Marcos - Buda - Kyle Edition | December 2025

BLANCO RIVER

1626

Transportation

BY AMANDA CUTSHALL & GRACIE WARHURST

967

CULLEN BLVD.

45 TOLL

Buda

Upcoming projects

AUSTIN ST.

JACK C. HAYS TRAIL

35

REMUDA TRAIL

1 RM 967 deceleration lanes Project: Deceleration lanes are being added to RM 967 in two locations:

GROVE LN.

3

San Marcos

1A

N. JOHNSON AVE.

CULLEN BLVD.

1B

35

SAN ANTONIO ST.

967

1A Garlic Creek Drive at Remuda Trail 1B Garlic Creek Drive at Grove Lane Update: in nal construction plans • Timeline: 2021-TBD • Cost: $500,000 • Funding source: 2021 Buda bond 2 Austin Street reconstruction

2001

12 45 TOLL

GARLIC CREEK DR.

2

AUSTIN ST.

Buda

PITT ST.

WINDY HILL RD.

2001

2770

WONDER WORLD DR.

Project: The reconstruction of Austin Street, from FM 2770 to San Antonio Street, will include parking, sidewalks and stormwater improvements. Update: at 60% design phase • Timeline: 2021-TBD • Cost: $8.6 million • Funding source: 2021 Buda bond 3 Bishop and Belvin Street improvements Project: Work includes a full-depth road reconstruction with drainage, water, wastewater, retaining walls and sidewalk improvements from Belvin Street to West San Antonio Street. Update: at 90% design phase; acquisition process underway 150 • Timeline: 2026-28 • Cost: $11.26 million • Funding source: Capital Improvement Program; city utility and general funds BLANCO RIVER

SA

35

150

2001

6A

4

123

KYLE PKWY.

N. MAIN ST.

SIX CREEK BLVD.

35

WINDY HILL RD.

BUNTON CREEK RD.

6B 6C 6D

2001

21

Kyle

5

OLD STAGECOACH RD.

RATTLER RD.

MAP NOT TO SCALE N

35

5 Old Bastrop Road widening Project: The project will widen Old Bastrop Road from Rattler Road to Centerpoint Road, including the addition of a 16-inch water main. Update: water main installed in September; waterline crossing at Centerpoint Road underway • Timeline: 2025-26 • Cost: TBD • Funding source: 2025 road project certiicates of obligation 6 Old Stagecoach Road widening and Center Street improvements Project: The project will widen Old Stagecoach Road into a continuous four-lane road from Veterans Drive to Main Street. Work will be completed in three parts: Kyle 150

6A north portion of Old Stagecoach Road from Veterans Drive to Six Creeks Boulevard 6B Old Stagecoach Road from Six Creeks Boulevard to Center Street 6C Center Street from Old Stagecoach Road to Veterans Drive 6D expand the roadway from two to three lanes from 21

Ongoing projects

4 Kyle Parkway-Lehman Road extension Project: The 1.3-mile project that connects Bunton Creek Road to Dacy Lane, utilizing four lanes with four roundabouts. Update: in nal design phase; construction anticipated

Veterans Drive to Main Street Update: in nal design phase • Timeline: 2023-27 • Cost: $41.2 million • Funding source: 2022 Kyle bond

to begin in early 2026 • Timeline: 2023-27 • Cost: $42.5 million • Funding source: 2022 Kyle bond