San Marcos - Buda - Kyle Edition | October 2025

Transportation

BY AMANDA CUTSHALL & SHANNON WEST

Ongoing projects

Buda

REMUDA TRAIL

GROVE LN.

SAN ANTONIO ST.

967

2770

150

1

GARLIC CREEK DR.

KYLE PKWY.

1626

2770

DACY LN.

SIX CREEKS BLVD.

San Marcos

LEHMAN RD.

BELVIN ST.

OLD BASTROP HWY.

6

5

35

123

4

2

N. BISHOP ST.

RATTLER RD.

5 Old Bastrop Highway widening Project: The project will widen Old Bastrop Highway from Centerpoint Road to Rattler Road and add a 16-inch water main. Update: Water main installed in September, waterline crossing at Centerpoint Road underway • Timeline: 2024-25 • Cost: TBD • Funding source: 2025 road project certificates of obligation

W. SAN ANTONIO ST.

BUNTON CREEK RD.

CENTERPOINT RD.

Kyle

OLD STAGECOACH RD.

150

MAP NOT TO SCALE N

3 Austin Street reconstruction Project: The reconstruction of Austin Street from FM 2770 to San Antonio Street, will include on-street parking, sidewalks and stormwater management features. Update: At 30% design phase

Upcoming projects

1 RM 967 deceleration lanes Project: The project will add deceleration lanes to RM 967 in two locations: Garlic Creek Drive/Remuda Trail

and Garlic Creek Drive/Grove Lane. Update: In final construction plans • Timeline: 2021-TBD • Cost: $2.57 million • Funding source : 2021 Buda bond

• Timeline: 2021-TBD • Cost: $6.76 million • Funding source: 2021 Buda bond

• Timeline: 2023-27 • Cost: $41.2 million • Funding source: 2022 Kyle road bond

Ongoing projects

6 Kyle Parkway-Lehman extension Project: The 1.3-mile project will connect Bunton Creek Road to Dacy Lane, utilizing four lanes with four roundabouts. Update: In final design phase

2 Bishop & Belvin Street improvements Project: The full-depth road reconstruction project will include drainage, water, wastewater, retaining walls and sidewalk improvements, according to the city of San Marcos Capital Improvement Project map. Update: At 60% design phase with acquisition process in the works

4 Old Stagecoach Road widening Project: The project will widen Old Stagecoach Road and Center Street into a continuous four-lane road from FM 2770 to FM 150. Work will be completed in three parts: the north portion of Old Stagecoach Road from FM 2770 to Six Creeks Boulevard, Old Stagecoach Road from Six Creeks Boulevard to Center Street and Center Street from Old Stagecoach Road to FM 150. Update: 70% complete, with ongoing work to expand it to four lanes and install roundabouts at Six Creeks and Center Street

• Timeline: 2023-27 • Cost: $42.5 million • Funding source: 2022 Kyle road bond

• Timeline: 2026-28 • Cost: $11.26 million

• Funding sources: Capital Improvement Program, city water, wastewater, drainage, electric and general funds

Discover San Marcos Academy Information Session, Tour, Lunch OPEN HOUSE O P E N H O U S E November 12, 2025 / 9:00 AM

Where tradition meets excellence Discover San Marcos Academy, a Christ-centered private school, located in the Texas Hill Country, shaping students from PreK3 - 12 and boarding students from 6-12. Since 1907, SMA has equipped young leaders from around the world to grow in faith, wisdom and purpose.

Register by November 5

512-753-8000 admissions@smabears.org www.smabears.org

23

SAN MARCOS - BUDA - KYLE EDITION

Powered by