Bastrop - Cedar Creek Edition | August 2025

Development

BY JOEL VALLEY

1

2

3

PHOTOS BY JOEL VALLEY/COMMUNITY IMPACT

• Installing railing • Installing decorative lights 1 Bastrop residents walk across the Old Iron Bridge during the kickoff event. 2 Community members used to place locks along the chain-link fence on the bridge. On Aug. 14, officials re- moved them, but said they have plans for the “symbols of love and Bastrop history.” 3 Construction crews are starting work on the project that will see the local landmark brought back to life.

Old Iron Bridge project kicks off Bastrop’s Old Iron Bridge was open to foot traffic July 26, when the city hosted a kickoff event for a $10.1 million project to rehabilitate the local landmark. The project—designed by Austin-based Huitt-Zollars and set to be completed by Dripping Springs-based Jay- Reese Contractors—will feature several improvements, including: • Adding a concrete deck • Adding steel truss components

Searching for an orthopedic specialist near you?

Appointments available — find a time that works for you Don’t let ongoing bone and joint pain slow you down. Schedule care now with an orthopedic specialist such as Michael M. Albrecht, MD, one of many doctors with Ascension Seton Smithville Health Center. Start a conversation about care for a chronic condition or new symptoms, including options for minimally invasive surgery, partial and total joint replacement, sports medicine and active injury care, and physical therapy and rehabilitation.

Michael M. Albrecht, MD Orthopedic Surgery

Ascension Seton Smithville Health Center 1201 Hill Road, Suite A Smithville, TX 78957

To schedule an appointment, call 737-255-5163 or scan the QR code.

© Ascension 2025. All rights reserved.

8

COMMUNITYIMPACT.COM

Powered by