Display
BY SHAHERYAR KHAN
TxDOT plans improvements to Grand Parkway frontage roads According to a news release, the proposed front- age roads—spanning approximately 3 miles—will feature 8- to 10-foot-wide continuous shared-use paths designed for both bicycles and pedestrians, and this path will connect with the existing shared-use pathway. The project also includes adjustments of ramp access, according to the news release. What else? Approximately 6.77 acres of right of way would be required for the project. According to the T H Y 99 TOLL L D R . BAY HILL BLVD.
The Texas Department of Transportation is seeking public comment on improvements along the Grand Parkway between Highland Knolls/Bay Hill Boulevard and South Fry Road to enhance transportation in the area. The details The proposed plans from TxDOT and Fort Bend County for the Grand Parkway improvement project costing about $87 million includes adding continuous two-lane frontage roads. • A section of frontage road will be constructed along Grand Parkway northbound from South Fry Road to Highland Knolls/Bay Hill Boulevard. • Two additional sections of frontage road will be constructed along Grand Parkway southbound from Highland Knolls/Bay Hill Boulevard to Cinco Ranch Boulevard and from Westheimer Parkway to South Fry Road.
release, the project does not expect any homes or commercial buildings to be forced to move or be removed due to its implementation. Construction for the project is expected to start in mid 2025 and would take place in flood plains and wetlands, so environmental considerations will be taken into account, according to the release.
N
FRY ROAD NORTH 3811 N Fry Rd (281) 578-0916 MASON ROAD 1640 S Mason Rd (281) 395-6262
FRY ROAD 1743 Fry Rd (281) 579-7004 KATY MILLS 24417 Katy Fwy (281) 394-5780
Powered by FlippingBook